<sub id="1zg57"><address id="1zg57"><nobr id="1zg57"></nobr></address></sub>
<table id="1zg57"><th id="1zg57"><big id="1zg57"></big></th></table>
  • <form id="1zg57"><span id="1zg57"></span></form>

    <nav id="1zg57"><listing id="1zg57"></listing></nav>
    <em id="1zg57"></em>
    1. <form id="1zg57"></form>

    2. Navigation

      • Skip to Content
      This website uses cookies, our own and those of third parties, to provide the best possible experience. By continuing to use our website you consent to the use of these cookies. For more information, please Click Here
      Putzmeister
      SANY Logo
      • MERCHANDISING SHOP
      MY Putzmeister

      Join the conversation

      PGSRegions-web Portlet

      • INTERNATIONAL
      • EUROPE
      • AMERICAS
      • ASIA PACIFIC
      • AFRICA & MIDDLE EAST
      • RUSSIA & CIS
      • INDIAN SUBCONTINENT
      • English

      Navigation

      Toggle navigation
      • Updates
        image
        Updates

        Your window to the latest happenings at Putzmeister

        • Putzmeister in the News
          image
          Putzmeister in the News

          The latest news from Putzmeister

          • Asset Publisher

            On February 17th, 2020 Mr. Pius Neo joined Putzmeister as Regional Parts and Service Manager Asia Pacif...READ MORE

        • Press Releases
          image
          Press Release

          Heads up on what’s happening on Putzmeister

          • Asset Publisher

            On February 17th, 2020 Mr. Pius Neo joined Putzmeister as Regional Parts and Service Manager Asia Pacif...READ MORE

        • PM Post
          image
          PM Post

          Keeping you in the know

          • Asset Publisher

            Best Support Underground seeks to provide readers with useful, inspiring content about the wonderful wo...READ MORE

        • Events
          image
          Events

          Bringing Putzmeister to you

          • Asset Publisher

        • Archives
          image
          Archives

          The Putzmeister Encyclopedia

      • Success Stories
      • Products
        image
        Products

        Our extensive range of equipment

        • Concrete
          Concrete

          Solutions to all your concrete needs

          • CONCRETE PUMPS
            • TRUCK MOUNTED CONCRETE PUMPS
            • STATIONARY CONCRETE PUMPS
            • CRAWLER CONCRETE PUMPS
            • PRE-CAST EQUIPMENT
            • BORE PILE FILLING
          • PLACING SYSTEMS
          • BUFFER STORAGE
          • TECHNOLOGY
          • USED MACHINES
        • Shotcrete
          Shotcrete

          Power & accuracy to deliver results

          • MECHANISED
          • MANUAL
          • WET-MIX
          • TECHNOLOGY
          • USED MACHINES
        • Telebelt?
          Telebelt?

          Versatile equipment for quick results

          • PRODUCT RANGE
          • TECHNOLOGY
          • USED MACHINES
        • Mortar
          Mortar

          Reliable. Productive. User-friendly

          • COMPRESSED-AIR SCREED CONVEYORS
          • PUMPS FOR SELF-LEVELLING COMPOUND
          • SELF LEVELLING SCREED PUMPS
          • PLASTERING MACHINES
          • PUMPS FOR CONCRETE REPAIR
          • PUMPS FOR GEOTHERMAL DRILLING
          • PUMPS FOR FIRE PROTECTION
          • PUMPS FOR GLASS FIBRE REINFORCED CONCRETE
          • PUMPS FOR INJECTION/GROUTING/FILLING
          • PUMPS FOR MASONRY MORTAR
          • ETICS COMPOSITE BINDER
          • SAND,GRAVEL AND AGGREGATE
          • TECHNOLOGY
          • USED MACHINES
        • Tunnelling
          Tunnelling

          Safety. Quality. High Performance

        • Mining
          Mining

          Master the underground

        • Energy
          Energy

          Prioritising energy conservation

        • Environment
          Environment

          Reliable, eco-friendly systems

      • Support
        image
        Support

        Helping your operations run smoothly

        • Service
          image
          Service

          Helping your operations run smoothly

          • Warranty
          • Register Equipment
        • Training
          image
          Training

          Make the best use of your machines

      • Parts
      • About Us
        image
        About Us

        Get to know us better

        • Putzmeister at a glance
          image
          Putzmeister at a glance

          What Putzmeister’s all about!

        • Technology
          image
          Technology

          Putzmeister offers high-end Technology

        • Global Leadership & Our Team
          image
          GLOBAL LEADERSHIP & OUR TEAM

          Meet our skilled team

        • Our History
          image
          Our History

          Putzmeister : how it began to now

      • Contact Us
      • Careers
      • Webshop
      • Search
      • Search

        Search

        search

      Success Story Details - ASIA PACIFIC

      Asset Publisher

      • STADIUM, GWINNETT COUNTY, GEORGIA, USA

        PURE TEAM SPIRIT READIED THIS STADIUM WITHIN THE STIPULATED ONE YEAR

      WHEN YOU BUILD A NEW BASEBALL STADIUM IN 10 MONTHS FLAT, THAT’S A HOME RUN

      | America | Story
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn

      January 2008 saw an agreement between the Atlanta Braves, the Gwinnet Convention and the Visitors Bureau. The agreement finalized the plans to bring the Gwinnet Braves home.

      The decision was reached based on a feasibility study conducted by the Gwinnet Commission and the Visitors bureau, which shortlisted Gwinnet County as the strongest markets in the country to support a baseball team.

      PUTZMEISTER EQUIPMENT

      VIEW ALL PRODUCTS

      The Challenge :

      This time the race was against time. The construction team had not a day more than a year to complete the stadium.

      Working into the night on the Gwinnet County baseball stadium to meet the tight deadline

      Working into the night on the Gwinnet County baseball stadium to meet the tight deadline

       

      The Solution :

      Nestled on a 12-acre site in Lawrenceville, Georgia, the new home of the Gwinnett Braves was first realized by Gwinnett County Commissioner Bert Nasuti, when he expressed his dream of bringing a minor league baseball team to the County during a planning retreat in 2006.

      A feasibility study, conducted by the Gwinnett Convention and Visitors Bureau in 2007, concluded “the demographic and socioeconomic makeup of Gwinnett County and the surrounding areas provide one of the strongest markets in the country to support a minor league baseball team.”

      By late 2007, the Atlanta Braves suggested relocating their minor league team to Gwinnett County, and with that, an agreement was signed in January 2008, between the Atlanta Braves and the Gwinnett Convention and Visitors Bureau, to bring the Braves home.

      Bringing on the ‘AAA’ Team
      Forrest Brewer, the general superintendent for Barton Malow Company, the construction manager of the project, and his team, based in Alpharetta, Georgia, hired Precision Concrete Construction (Precision) as the concrete sub-contractor. Precision then hired Smyrna, Georgia-based Pioneer as the concrete pump sub-contractor, and LaFarge of North America as the concrete ready mix company.

      With the 2009 baseball season slated for the unveiling of the new stadium and new team, a tight timeline was set into place, with work quickly beginning in April 2008 – exactly one year before the home opener of the new facility.

      “Because of the strict schedule, we wanted to make sure we chose a concrete pump company that had all the necessary equipment to get the job done on time and on demand without question,” says Justin Garrett, project manager for Precision.”

      “To pump the 10,785 cubic yards of concrete (8,246m3), our team brought on our entire fleet of concrete pumps, from our compact 20Z-Meter to our seven-axle 63Z-Meter,” says Chuck Maddox, sales representative for Pioneer.

      As Garrett adds, “With their vast range of concrete pumps, we knew we could rely on them for having the right size pump and boom reach for whatever the project required from day-to-day, or even hour-to-hour.”

      Beating the Clock
      “The concrete pump company was a true team player, providing the ultimate flexibility and dependability of their pumps, given the multiple changes to the architectural drawings of the stadium and the necessity to maintain the original concrete placement schedule to a ‘T’,” comments Millard Farmer, superintendent for Precision.

      The $58.1-million design-build stadium project includes three sections: Building A on the home field side, Building B on the visitors side, and Area C, the press box behind home plate and where Buildings A and B connect.

      The concrete pump company pumped and placed concrete for all three sections and faced a strict concrete placement timeline:
      ? June through August 2008: 1,250 cubic yards (956m3) of concrete for all footings
      ? August 2008: 370 cubic yards (283m3) of concrete for Building A’s slab-on-grade
      ? September 2008: 607 cubic yards (464m3) of concrete for Building B’s slab-on-grade
      ? August and September 2008: 1,100 cubic yards (841m3) of concrete for the Tunnel walls, dugouts and field walls
      ? September through December 2008: 1,810 cubic yards (1,384m3) of concrete for the seating bowl
      ? September 2008: 550 cubic yards (421m3) of concrete for Building A’s concourse level elevated slab at top of seating bowl
      ? September 2008: 400 cubic yards (306m3) of concrete for Building B’s concourse level elevated slab at top of seating bowl
      ? October 2008: 690 cubic yards (528m3) of concrete for Building A’s suite level elevated slab
      ? October 2008: 565 cubic yards (432m3) of concrete for Building B’s suite level elevated slab
      ? October 2008: 289 cubic yards (221m3) of concrete for Area C suite level
      ? September through November 2008: 550 cubic yards (421m3) of concrete for Building A and Building B’s architectural walls and columns
      ? November and December 2008: 530 cubic yards (405m3) of concrete for topping slabs
      ? January through March 2009: 681 cubic yards (521m3) for hardscapes

      “Our boom pumps were placing 500 cubic yards (382m3) of concrete on average per week, but on our best week, as much as 1,088 cubic yards (832m3) was pumped and placed,” explains Maddox. “We were steadily on site five to six days a week, and had as many as three pumps on site at one time.”

      “All of Pioneer’s pumps showcased their extreme mobility,” adds Brian McCormick, general superintendent for Precision. “Some days, we’d pump and place in four or five locations with one pump. All of their pumps moved easily from location to location.”

      “In addition, the flexibility of their boom pump fleet was a tremendous advantage to have on this job,” says Garrett. “When the 38Z-Meter pumped and placed Area C’s concourse level slab, the structural concrete frame was already installed, so the pump easily maneuvered its four-section, Multi-Z boom under the structure to reach exactly where the concrete needed to be placed.”

      The 47Z-Meter also flexed its adaptability muscle on site.

      “As the five-section 47Z placed concrete for Building B’s concourse level topping slab, its Z-Fold boom configuration was able to handle the restrictive space and easily navigate its way down and around the structural concrete frame,” says Garrett.

      The 47Z placed 112 cubic yards of concrete (86m3) for this section.

      “Due to job site conditions we had to have the boom pump back a certain distance from where the concrete would actually be placed,” comments Maddox. “With the 47Z we were able to achieve its maximum horizontal reach of 138' 1" (42.09mm) and place the concrete without having to add any extra hose system, keeping the job site clean.”

      This concrete pump was also on hand to pump and place concrete for the seating bowl of the stadium, and on the same day, easily relocated to another spot on the site where it placed 12 cubic yards of concrete (9.2m3) for the caisson footing for a stadium light pole.

      “The strict schedule demanded both pours be completed in the same day, and we knew we could depend on our versatile 47Z,” says Maddox.

      Maddox continues, “And during one of our night pours, our 58-Meter pitched in to pump 360 cubic yards of concrete (275m3) at 108 cubic yards per hour (83m3/hr) for the suite level’s elevated slab in Building B. The width and elevation of this slab were so great that it required the 58-Meter’s maximum vertical reach of 188' 1" (57.33m) to get up and across the deck. Because of the unit’s vertical reach, we didn’t have to move the 58 – it stayed in the same location for the entire pour.

      The concrete pump company’s powerful 63Z-Meter also made an appearance on site pumping and placing 61 cubic yards (47m3) of concrete for handicap seating, or ADA platforms, in the VIP seating area.

      “We couldn’t access the field so we had the pump located in the player’s parking lot, and used its 190' 7" horizontal reach to stretch the five-section Z-Fold boom over a portion of Building A and to the point of placement,” says Garrett.

      In addition, the pump company also had their compact City Pump on site to pump and place 18 cubic yards (14m3) of concrete for metal pan stairs.

      The Mixed Lineup
      Eight different types of concrete mixes were pumped and placed by Pioneer’s boom pumps. The mixes were used for footings, slab-on-grades, columns, walls, elevated decks, architectural walls, topping slabs/paving and the seating bowl.

      “For the footings, we used a 3,000-psi mix,” says Chris Benifield, senior project manager for Precision. “The slab-on-grade mix for the exterior of the seating bowl includes more entrained air in it to help against freeze/thaw cycles.

      “In addition, the slab-on-grade interior mix was a 4,000-psi mix. The architectural wall concrete mix used a smaller aggregate to provide fewer voids around architectural reveals in formwork.”

      The elevated beam and slab mix required a high early strength mix design. The high early mix contained more cement to help reach its design strength faster and a higher overall strength than usual, according to Benifield. The mix allowed the concrete to reach 3,000 psi in as little as one day, the strength Benifield’s team needed in order to strip the formwork under the slab and continue on with their work. This mix fit perfectly with the fast-paced schedule of the project.

      “In addition to the other mixes, we also used Chronolia, a LaFarge innovative concrete that retains its work-ability for two hours, offering easy placement, while achieving high early strength due to accelerated hydration growth giving us the ability to strip form work 4 hours after batching,” adds Benifield. “We used this mix on some of the columns at the suite level so the structural steel columns could be placed the next day.”

      It’s a Home Run!
      The Gwinnett Braves are well into their inaugural season and settling into their new home. The new stadium, according to the County’s economist, Dr. Alfie Meek, is estimated to bring in $15 million new economic activity to the county, support about 200 new jobs countywide and generate approximately $6.5 million in new personal income.

      PROJECT PARTNERS

      Owner/Developer: Gwinnett Convention & Visitors Bureau—Duluth, Georgia

      Architect: HKS, Inc.—Atlanta, Georgia

      Construction Manager: Barton Malow Company—Alpharetta, Georgia

      Concrete Sub-Contractor: Precision Concrete Construction—Alpharetta, Georgia

      Concrete Pump Sub-Contractor: Pioneer Concrete Pumping Service, Inc.—Smyrna, Georgia

      Concrete Ready Mix Company: LaFarge North America — Alpharetta, Georgia

      Equipment: Putzmeister 20Z-, 28Z-, 32Z-, 36Z-, 38Z-, 40Z-, 43Z-, 47Z, 52Z-, 58-, 61- and 63Z- truck-mounted concrete boom pumps. One Putzmeister City Pump.

      A total of 10,785 cubic yards (8,246m3) of concrete was placed by the pumping company’s boom pumps for the Gwinnett Braves stadium.

      A total of 10,785 cubic yards (8,246m3) of concrete was placed by the pumping company’s boom pumps for the Gwinnett Braves stadium.

      The pumping company had their entire fleet of Putzmeister concrete pumps on site.

      The pumping company had their entire fleet of Putzmeister concrete pumps on site.

      A 40Z-Meter pumps and places 57 cubic yards (44m3) for the elevated concourse slab above the Gwinnett Braves players’ parking lot.

      A 40Z-Meter pumps and places 57 cubic yards (44m3) for the elevated concourse slab above the Gwinnett Braves players’ parking lot.

      The Gwinnett Braves’ new stadium.

      The Gwinnett Braves’ new stadium.

      Concrete takeaways :

      ? The new stadium, according to the County’s economist, Dr. Alfie Meek, was estimated to bring in $15 million new economic activity to the county, support about 200 new jobs countywide and generate approximately $6.5 million in new personal income.

      ? The entire fleet of Putzmeister’s concrete pumps, right from the compact 20Z-Meter to the seven-axle 63Z-Meter, were deployed.

      NEXT UP IN SUCCESS STORIES

      • World’s Largest Concrete Boom Pump Reaches Success on Historic Project
      • The Grand Pour
      • Goldman Sachs Tower, Jersey City, USA
      • Stadium, Gwinnett county, Georgia, USA
      • Modern Art Museum, Fort Worth, USA
      • Lambeau Field, Wisconsin, USA
      • Hoover Dam bypass, USA
      • 9/11 monument, New York, USA
      • Tacoma Narrows Bridge, Seattle, Washington, USA
      • An Amazonian City

      VIEW ARCHIVES

      Next
      Putzmeister Logo

      Putzmeister South East Asia CT Pte Ltd.

      No. 7 Kranji Loop
      Singapore 739543

      Phone: +65-6293 20 29 
      Facsimile: +65-6293 11 58 
      E-mail: 
      contact.apac@putzmeister.com

      PARTNERNET

      CRM

      • PARTNERNET
      • CRM

      Products

      • Concrete
      • Shotcrete
      • Telebelt?
      • Mortar
      • Tunnelling
      • Mining
      • Energy
      • Environment

      UPDATES

      • Putzmeister in the news
      • Press Releases
      • PM Post
      • Events

      Success Stories

      • Jin Mao building, Shanghai
      • Qinghai-Tibet Railway, China

      Spare Parts


      SUPPORT

      • Service
      • Warranty
      • Training

      ABOUT US

      • Our History
      • Putzmeister at a glance
      • Global Leadership & Team
      • Technology

      CAREERS


      Used Machines


      CONTACT US


      Privacy Statement

      • PM SINGAPORE
      • PM JAPAN
      • PM KOREA

      Imprint


      MERCHANDISE

      Downloads


      Sitemap
      亚洲做性视频在线观看